The Consumer of electrical service is at the core of the Authority’s work. In line with the Authority’s role in protecting Consumers, regulations and instructions with which Service Providers must comply have been established to ensure a reliable electrical service that safeguards Consumer rights and obligations.
Your rights are reserved with the Authority:
|
Extra-High-Voltage Transmission |
||
|
Required Work (per order) |
Financial Compensation (SAR) |
|
|
Preliminary study work |
Preliminary study |
150,000 |
|
Modification of the scope of work, location or feeding path |
37,500 |
|
|
Adjusting demand loads and resulting in modifying the primary transmission supply voltage |
75,000 |
|
|
The amendment to the application resulted in the necessity of conducting a specialized technical study |
||
|
Request to add more than one option in the project study on Extra-high voltage transmission |
||
|
Planning, engineering, and engineering supervision works |
Standard project |
8,000,000 |
|
Additional feed for the standard project (SAR/additional circuit) |
2,000,000 |
|
|
Implementing an additional conversion station for the same project as the service applicant |
4,800,000 |
|
|
Executing a project with more equipment than the standard project equipment |
2,000,000 |
|
|
Load splitting at low distribution voltage |
1,000 for each meter, including its accessories and installation |
|
|
Extra-High-Voltage Transmission |
||
|
Required Work (per order) |
Financial Compensation (SAR) |
|
|
Preliminary study work |
Preliminary study |
150,000 |
|
Modification of the scope of work, location or feeding path |
37,500 |
|
|
Adjusting demand loads and resulting in modifying the primary transmission supply voltage |
75,000 |
|
|
The amendment to the application resulted in the necessity of conducting a specialized technical study |
||
|
Request to add more than one option in the project study on Extra-high voltage transmission |
||
|
Planning, engineering, and engineering supervision works |
Standard project |
8,000,000 |
|
Additional feed for the standard project (SAR/additional circuit) |
2,000,000 |
|
|
Implementing an additional conversion station for the same project as the service applicant |
4,800,000 |
|
|
Executing a project with more equipment than the standard project equipment |
2,000,000 |
|
|
Load splitting at low distribution voltage |
1,000 for each meter, including its accessories and installation |
|
|
Extra-High-Voltage Transmission |
||
|
Required Work (per order) |
Financial Compensation (SAR) |
|
|
Preliminary study work |
Preliminary study |
150,000 |
|
Modification of the scope of work, location or feeding path |
37,500 |
|
|
Adjusting demand loads and resulting in modifying the primary transmission supply voltage |
75,000 |
|
|
The amendment to the application resulted in the necessity of conducting a specialized technical study |
||
|
Request to add more than one option in the project study on Extra-high voltage transmission |
||
|
Planning, engineering, and engineering supervision works |
Standard project |
8,000,000 |
|
Additional feed for the standard project (SAR/additional circuit) |
2,000,000 |
|
|
Implementing an additional conversion station for the same project as the service applicant |
4,800,000 |
|
|
Executing a project with more equipment than the standard project equipment |
2,000,000 |
|
|
Load splitting at low distribution voltage |
1,000 for each meter, including its accessories and installation |
|
|
Extra-High-Voltage Transmission |
||
|
Required Work (per order) |
Financial Compensation (SAR) |
|
|
Preliminary study work |
Preliminary study |
150,000 |
|
Modification of the scope of work, location or feeding path |
37,500 |
|
|
Adjusting demand loads and resulting in modifying the primary transmission supply voltage |
75,000 |
|
|
The amendment to the application resulted in the necessity of conducting a specialized technical study |
||
|
Request to add more than one option in the project study on Extra-high voltage transmission |
||
|
Planning, engineering, and engineering supervision works |
Standard project |
8,000,000 |
|
Additional feed for the standard project (SAR/additional circuit) |
2,000,000 |
|
|
Implementing an additional conversion station for the same project as the service applicant |
4,800,000 |
|
|
Executing a project with more equipment than the standard project equipment |
2,000,000 |
|
|
Load splitting at low distribution voltage |
1,000 for each meter, including its accessories and installation |
|