Explore the costs associated with connecting electrical services at various voltage levels, designed to ensure fairness and transparency for both service applicants and providers while maintaining high standards of quality and efficiency.
Preliminary study:
The initial works before signing the electricity service connection agreement, to study the available connection options and estimate their costs, in order to prepare a plan and connection agreement for the service applicant.
Planning, engineering, and engineering supervision:
The works of planning, preparing the topographic survey, procedures for securing the right of way, engineering works from preparing the scope of work, technical specifications, and contract documents, including the costs of bidding and tendering, in addition to the costs of engineering supervision to ensure compliance with the specifications and technical requirements.
Standard project for high-voltage transmission:
A substation containing three or fewer high-voltage transformers and connecting them to two feeder circuits at high voltage (overhead lines/underground cables) and expanding the source station which meets the standard technical requirements.
Standard project for extra-high-voltage transmission:
A substation containing three extra-high-voltage transformers and three or fewer high-voltage transformers and connecting them to two feeder circuits at extra-high voltage (overhead lines/underground cables) and expanding the source station which meets the standard technical requirements.
| Circuit breaker capacity (kVA) greater than |
Circuit breaker capacity (kVA) to |
Financial compensation (SAR/kVA) |
| 1 | 30 | 60 |
| 30 | 60 | 95 |
| 60 | 120 | 120 |
| 120 | 500 | 175 |
| Required Work (per order) |
Financial Compensation (SAR) |
| Preliminary study work | 25,000 |
| Planning, engineering, and engineering supervision works | 75,000 |
| load splitting at low distribution voltage for the purpose of consumption measurement |
1,000 for each meter, including its accessories and installation |
|
High-Voltage Transmission |
||
|
Required Work (per order) |
Financial Compensation (SAR) |
|
|
Preliminary study work |
Preliminary study |
150,000 |
|
Modification of the scope of work, location or feeding path |
37,500 |
|
|
Adjusting demand loads and resulting in modifying the primary transmission supply voltage |
75,000 |
|
|
The amendment to the application resulted in the necessity of conducting a specialized technical study |
||
|
Request to add more than one option in the project study on high voltage transmission |
||
|
Planning, engineering, and engineering supervision works |
Standard project |
6,000,000 |
|
Additional feed for the standard project (SAR/additional circuit) |
1,500,000 |
|
|
Implementing an additional conversion station for the same project as the service applicant |
3,600,000 |
|
|
Executing a project with more equipment than the standard project equipment |
1,500,000 |
|
|
Load splitting at low distribution voltage |
1,000 for each meter, including its accessories and installation |
|
|
Extra-High-Voltage Transmission |
||
|
Required Work (per order) |
Financial Compensation (SAR) |
|
|
Preliminary study work |
Preliminary study |
150,000 |
|
Modification of the scope of work, location or feeding path |
37,500 |
|
|
Adjusting demand loads and resulting in modifying the primary transmission supply voltage |
75,000 |
|
|
The amendment to the application resulted in the necessity of conducting a specialized technical study |
||
|
Request to add more than one option in the project study on Extra-high voltage transmission |
||
|
Planning, engineering, and engineering supervision works |
Standard project |
8,000,000 |
|
Additional feed for the standard project (SAR/additional circuit) |
2,000,000 |
|
|
Implementing an additional conversion station for the same project as the service applicant |
4,800,000 |
|
|
Executing a project with more equipment than the standard project equipment |
2,000,000 |
|
|
Load splitting at low distribution voltage |
1,000 for each meter, including its accessories and installation |
|